Factory acceptance testing. Sign in once on this device — after that it
opens straight away, with or without signal.
Don't know the password? Ask ROGER. It is the same one for everybody.
SoSub FAT
Factory Acceptance Tests
Pick a unit to carry on with, or start a new record. Everything is saved as you type and synced on its own — the chip above says whether it has reached the shared store.
In progress0
Completed0
Manage forms
What is on each form
Every check that can appear on a FAT is listed here. Tick which types each check applies to — a check ticked for both Compact and Standard is written once and kept in step on both. Changes apply to new records and to any existing record that has not recorded that check yet.
New Factory Acceptance Test
Southern Ocean Subsea Pty Ltd • Complete the details below to open the test record
1. What is being tested
Pick the type first — it decides which set of checks the record uses.
2. Identification
The unit code names the record and labels its tile on the dashboard. Fields marked * are required so two units can never be confused.
Letter for the type, then the unit number
3. Project
4. Personnel
The standard crew is pre-loaded — remove anyone not attending, or add others. Select a person from the bar at the top of the screen while testing and their initials plus the date are stamped automatically on every entry they make.
Full name
Initials
Role
Company
Document reference
—
File name if this FAT is exported
—
Everything is saved as you type and synced to the shared store on its own. Export writes this one FAT out as a file that opens on any computer with no internet — for the archive and for handing to a client.
—
—
Results Summary
Test in progress
Section
Title
Tests
Pass
Fail
NA
Not recorded
Status
Punch List & Non-Conformance Register 0 open
Every Fail must be raised here. A — blocks acceptance • B — accepted with agreed close-out date • C — minor / cosmetic, close out at site.
#
Test ref
Description
Cat
Raised by
Date
Agreed close-out
Target
Closed
Test Equipment Register
All measuring equipment shall hold current calibration for the duration of the test.
Equipment
Manufacturer / model
Serial number
Certificate no.
Cal date
Cal due
Used for
Attendance and Sign-On Record
All attendees to sign on before testing commences. Personnel entered in Details are pre-loaded.
Name
Company
Role
Date on
Signature
FAT Acceptance Certificate
The vehicle identified below has been tested in accordance with this procedure. Results and outstanding punch items are as recorded in this document.
Delete this FAT
This cannot be undone. Export it first if you may need it.