SoSub FAT

Factory acceptance testing. Sign in once on this device — after that it opens straight away, with or without signal.

Don't know the password? Ask ROGER. It is the same one for everybody.

SoSub FAT

Factory Acceptance Tests

Pick a unit to carry on with, or start a new record. Everything is saved as you type and synced on its own — the chip above says whether it has reached the shared store.

In progress0
Completed0
Manage forms

What is on each form

Every check that can appear on a FAT is listed here. Tick which types each check applies to — a check ticked for both Compact and Standard is written once and kept in step on both. Changes apply to new records and to any existing record that has not recorded that check yet.

New Factory Acceptance Test

Southern Ocean Subsea Pty Ltd  •  Complete the details below to open the test record

1. What is being tested

Pick the type first — it decides which set of checks the record uses.

2. Identification

The unit code names the record and labels its tile on the dashboard. Fields marked * are required so two units can never be confused.

Letter for the type, then the unit number

3. Project

4. Personnel

The standard crew is pre-loaded — remove anyone not attending, or add others. Select a person from the bar at the top of the screen while testing and their initials plus the date are stamped automatically on every entry they make.

Full nameInitialsRoleCompany
Document reference
—
File name if this FAT is exported
—
Everything is saved as you type and synced to the shared store on its own. Export writes this one FAT out as a file that opens on any computer with no internet — for the archive and for handing to a client.
—
—

Sections

Results Summary

Test in progress
SectionTitleTestsPassFailNANot recordedStatus

Punch List & Non-Conformance Register 0 open

Every Fail must be raised here. A — blocks acceptance • B — accepted with agreed close-out date • C — minor / cosmetic, close out at site.

#Test refDescriptionCatRaised byDateAgreed close-outTargetClosed

Test Equipment Register

All measuring equipment shall hold current calibration for the duration of the test.

EquipmentManufacturer / modelSerial numberCertificate no.Cal dateCal dueUsed for

Attendance and Sign-On Record

All attendees to sign on before testing commences. Personnel entered in Details are pre-loaded.

NameCompanyRoleDate onSignature

FAT Acceptance Certificate

The vehicle identified below has been tested in accordance with this procedure. Results and outstanding punch items are as recorded in this document.

Delete this FAT

This cannot be undone. Export it first if you may need it.